Central boiler replacement — condo building

A failing 25-year-old central boiler system was replaced with minimal disruption to residents' hot water and heating.

Location
Burnaby, BC
Building
8-storey condo building
Service
HVAC
Scope
Central boiler replacement and distribution system commissioning
Duration
3 weeks
Completed
2025

The problem

The building's original central boiler system was failing intermittently, leaving residents without heat or hot water for periods during the coldest months.

The strata council needed the replacement completed with a temporary heating plan so residents weren't without service.

What we found

Both boilers showed corrosion consistent with end-of-life heat exchangers, and the existing distribution system had several isolation valves that no longer sealed properly.

The mechanical room layout required reconfiguration to fit modern, more efficient condensing boilers.

The solution

We staged the replacement boiler-by-boiler so one unit remained in service throughout, supplemented by temporary rental heating during the changeover, replaced failed isolation valves, and commissioned the new condensing boilers for improved efficiency.

Result

The building now operates on a modern, more efficient boiler plant with no reported service interruptions during the changeover.

"We were worried about residents losing heat in January. West Peak kept the building running the whole time."

— Building manager, Burnaby

Before & after

Central boiler replacement — condo building — before
Before
Central boiler replacement — condo building — after
After