Rooftop unit replacement — office building

Two aging rooftop units serving a multi-tenant office building were replaced during a scheduled off-hours window.

Location
Vancouver, BC
Building
5-storey office building
Service
HVAC
Scope
Replacement of two rooftop packaged units, controls integration
Duration
10 days
Completed
2024

The problem

Two rooftop packaged units serving the third and fourth floors were undersized for current tenant loads and required frequent repairs.

Tenants needed the replacement completed without disrupting business hours across multiple companies.

What we found

Load calculations confirmed the replacement units needed to be one size larger to handle current occupancy, requiring updated curb adapters and electrical service coordination.

The building automation system needed new control points to integrate the replacement units.

The solution

We scheduled crane lifts and unit swaps for a weekend window, installed properly sized replacement units with new curb adapters, and integrated controls with the building automation system before Monday occupancy.

Result

Both floors had fully functioning, correctly sized HVAC before the next business day, with no tenant downtime.

Before & after

Rooftop unit replacement — office building — before
Before
Rooftop unit replacement — office building — after
After

Not sure what's causing the leak?

We'll assess the building, identify the failure point, and give you a written scope with a fixed price. No cost, no obligation.